Developers & Framers
Take-offs available for:
Multi-Family
Hotels
Senior Living Centers
Take-offs include:
- Specializing in Type 3 and Type 5 buildings.
- Review of design & development plans for budget take-off.
- We stay in touch with you throughout the project to answer any questions.
- Solve plan problems in the office before they get to the field.
- Free man-hours totals that are derived from the materials that are included on the list.
- Expedited service available at an extra cost.
- Detailed list of all framing materials and their placement from the ground up.
- Combined list of materials for quick pricing.
- Take-off divided in to floor, ceiling and roof drops.
- Extensive plan notes detailing problems and solutions.
Download Samples:
Available Services:
- Loose fill lumber list for panelized jobs
- Square foot estimate for budget analysis
- Standard lumber and FRT lumber take-offs
- Engineered wood products take-offs
- Simpson and ATS system take-offs
- Siding and exterior trim
- Windows, doors and interior trim